|
|
|
Metre Pannel Work |
|
|
|
|
|
|
|
|
|
Deep excavation required for the construction industries for the construction of subways and multi parking facility for basement parking in Mumbai. The protection wall of the Mithi River is also done by Meter Pannel. Making it an easy and durable retaining system.
The meter panel is a rectangular shaped bore developed wing conventional tripod rig with modified shape of the boring tools. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Major Work Details: |
- |
Metre Pannel Work |
|
|
|